Airport
CCS is well versed in Airport operations. All of our employees have background checks, and are properly credentialed, insured, and specialty-trained in specific protocols needed when working around, and above staged aircraft. Protocols are based on years of work experience in this demanding environment.
Some of our past and present projects include:
- 40’ x 100’ x 20’ walk in cooler that maintains cooler temperature +/– 2 degrees for pharmaceuticals
- Redundant cooling system
- Emergency backup generator system
- Transfer switch
- Temperature alarm system with dialer
- Pelco pan/tilt/zoom surveillance camera system for Laughlin International Airport
- Electrical power for numerous machines at the Indiana Maintenance Center. (formally the United Hangar)
- Parking lot lighting repairs / pole replacement
- Installation of 1142 energy efficient lights in the hangars with a 24 month ROI
- Electrical panel board installation for back up radio system installation
- Double ended feed switch gear cleaning and testing
- Commercial kitchen remodel with new exhaust hood installation
- Hangar vacuum system trouble shooting and repairs
- Commercial indoor fencing installation
- Dock leveler repairs
- Installation of one 192 kW electric duct bank heater
- Simplex fire panel relocation
- Fiber optic move
- Variable frequency drive installations
- Gas and air piping installation
- Plumbing repairs
- Welding and fabrication:
- Fabricating steel electrical hose carts
- Fabricating jet engine cowling stands
- Fabricating overhead aircraft storage bin racks
- Fabricating electrical, air rolling work tables for aircraft mechanics
Case study coming soon.